Le projet
Owner : Frigometro
City : Buga, Colombia
Surface : 12.111 m2
Delivery : 2019
Duration : 10 months
The existing infrastructure expansion project has a dual design, where depending on the final customer it can be used for dry storage or storage at controlled temperature.
Allowed on a platform created for the access of cargo vehicles, the project manages structural lights of 36 meters, providing flexible and immersed spaces within the wineries an area of mezzanines that will support the winery area. All wineries have double discharge zone with wide maneuvering patios that allow agile operation.